{"id":394,"date":"2021-08-07T18:41:37","date_gmt":"2021-08-07T18:41:37","guid":{"rendered":"https:\/\/itgeeks.in\/home\/?p=394"},"modified":"2021-08-07T18:41:38","modified_gmt":"2021-08-07T18:41:38","slug":"2k6ce-702-quantity-surveying-and-valuation","status":"publish","type":"post","link":"https:\/\/itgeeks.in\/home\/?p=394","title":{"rendered":"2K6CE 702 QUANTITY SURVEYING AND VALUATION"},"content":{"rendered":"\n<p><strong>Module I (14 hours)<\/strong><br>Quantity surveying: \u2013 Preparation of detailed estimate for :buildings \u2013 reinforced concrete structures, roadssanitary and water supply works.<br><strong>Module II (12 hours)<\/strong><br>Preparation of specification for common materials of construction and items of work as per IS-analysis of rates and preparation of abstract of estimate for buildings and other engineering structures.<br><strong>Module III (13 hours)<\/strong><br>Valuation: \u2013 Cost price and value \u2013purpose of valuation\u2013deferent forms of value-factors affecting changes in market values-Role of the valuer-nature of real property \u2013factors affecting real property market-value of real property.<br><strong>Module IV (13 hours)<\/strong><br>Methods of valuation for open lands-lands with buildings-Depreciation-valuation of licensed premises \u2013 valuation of agricultural lands.<br>&nbsp;<\/p>\n\n\n\n<p><strong>Reference Books<\/strong><br>1.<a href=\"https:\/\/itgeeks.in\/home\/?p=395\">Dutta B.N, Estimation and costing in civil engineering, UBSPD,1992<\/a>.<br>2.IS 1200(1968) Methods of measurements of building &amp;civil engineering works .<br>3.Rangavala, Valuation of real Properties, Charotar publishers.<br>4.Shah N A, Quantity surveying&amp; specification in civil engineering.<br>5.B.S Patil, Civil engineering contracts and estimates, University press.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link\" href=\"https:\/\/itgeeks.in\/home\/?p=202\">S7 Question Paper<\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Module I (14 hours)Quantity surveying: \u2013 Preparation of detailed estimate for :buildings \u2013 reinforced concrete structures, roadssanitary and water supply<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,22,9,8],"tags":[7],"class_list":["post-394","post","type-post","status-publish","format-standard","hentry","category-ku-s7-ce","category-ku-syb-s7","category-ku-syllabus","category-syllabus","tag-kannur-university"],"_links":{"self":[{"href":"https:\/\/itgeeks.in\/home\/index.php?rest_route=\/wp\/v2\/posts\/394","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/itgeeks.in\/home\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/itgeeks.in\/home\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/itgeeks.in\/home\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/itgeeks.in\/home\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=394"}],"version-history":[{"count":1,"href":"https:\/\/itgeeks.in\/home\/index.php?rest_route=\/wp\/v2\/posts\/394\/revisions"}],"predecessor-version":[{"id":398,"href":"https:\/\/itgeeks.in\/home\/index.php?rest_route=\/wp\/v2\/posts\/394\/revisions\/398"}],"wp:attachment":[{"href":"https:\/\/itgeeks.in\/home\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/itgeeks.in\/home\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=394"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/itgeeks.in\/home\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}